• March 7, 2025

CASE HISTORY: Installation of a system with two heat pumps

CASE HISTORY: Installation of a system with two heat pumps

CASE HISTORY: Installation of a system with two heat pumps 500 450 Eurotis

CASE HISTOY: Installation of a system with two heat pumps connected with EUROKLIMA

Carried out for the upgrade of an existing building in Lumezzane (BS), the site included the installation of a heat pump system consisting of two outdoor units, both with one supply and
one return line.

The outdoor units and the central heating unit were connected with the Eurotis PLT-CSST EUROKLIMA DN 25 formable corrugated pre-insulated tubes, specifically designed for heat pump systems.

The joint between the EUROKLIMA tubes and the units was made using Eurotis patented ePRESS Technology press fitting system. This guarantees maximum tightness on every type of system thanks to the double compression of
the fitting on the pipe.

The formability of the tubes also allowed only eight end fittings to be used, avoiding the need for elbow fittings.

The advantages

  • Rapid installation. The pipe is bent manually without using tools. This ensures easy installation even in
    awkward environments.
  • Reduced costs and installation time. The pipe allows for manual bends, even greater than 90°, thus
    avoiding the need to insert elbow and length fittings.
  • Safety in the system. Euroklima is made from an insulated stainless steel pipe that guarantees corrosion
    resistance and durability.
  • High performance. The 13 mm ultra-performance coating with micro-cell molecular structure has been
    specially designed and tested to ensure reliability and durability.
Worksheet

Reference: Residential building

Location: Lumezzane (BS)

Type: Implementation of a heat pump system

Scope: Residential

Installation: Termoidraulica GT