CASE HISTORY: System with 50 heat pumps

CASE HISTORY: System with 50 heat pumps

CASE HISTORY: System with 50 heat pumps 500 450 Eurotis

CASE HISTORY: Installation of a system with fifty heat pumps connected with EUROKLIMA

On a construction site in Verona, consisting of 7 buildings with a total of 50 individually managed apartments, Eurotis tubes were the ideal solution for the heating/cooling systems.

The heat pumps, installed on the roofs of the buildings, are connected via the EUROKLIMA DN 32 PLT-CSST pipe, which runs easily through the cavities to the storage rooms.

All this has been achieved without intermediate fittings, ensuring maximum reliability, reduced leakage and fast and efficient installation.

The joint between the EUROKLIMA tubes and the various units was made using Eurotis patented ePRESS Technology press fitting system. This has guaranteed maximum tightness on every type of system thanks to the double compression of the fitting on the pipe.

The advantages
  • Rolled tubes facilitated transport and installation.
  • The tubes already with insulation meant that the installer did not have to worry about insulating the tubes.
  • Continuous sections of PLT-CSST were installed without joints, with only 4 ePRESS fittings per line (heat pump and storage).
  • Installation times have been reduced by 80% compared to traditional materials, also reducing costs.
  • The installer managed to meet the delivery deadlines.

Worksheet

Reference: 7 condominiums

Location: Verona

Type: Implementation of an installation with 50 heat pumps

Scope: Residential

Installation: Edi Impianti